<em id="5rfrb"><form id="5rfrb"></form></em>
    
    
        <address id="5rfrb"></address>
        <form id="5rfrb"></form>

          <address id="5rfrb"></address>

              <address id="5rfrb"><nobr id="5rfrb"><progress id="5rfrb"></progress></nobr></address>
              Ropeway for Yichun Mingyue Mountain in Jiangxi
              DATE:17 November 2017 瀏覽次數:
              + . -

              This ropeway was commenced in July 2003, and completed in April 2004. It is of the monocable circulating 2-passanger cabinlift type (with fixed grips), with the horizontal distance of 2,226.285 m, elevation difference of 1,078.7 m and one-way transport capacity of 300 people / hour.

              This ropeway adopts several technical devices and measures invented by ENFI, such as the hydraulic-tension return system with automatic shift compensating wire residual elongation, fixed suspension driving system driven directly by both main and auxiliary motors, large-span automatic adjustment and balance device for affixing force at the end of wind load-resistant wheels on both sides, and multi-head & multi-wheel interlinking bracket, etc.

              It is the ropeway with largest elevation difference among ropeways of the same type in Asia.

              一本一本久久A久久精品综合