<em id="5rfrb"><form id="5rfrb"></form></em>
    
    
        <address id="5rfrb"></address>
        <form id="5rfrb"></form>

          <address id="5rfrb"></address>

              <address id="5rfrb"><nobr id="5rfrb"><progress id="5rfrb"></progress></nobr></address>
              Ropeway for Lanzhou Xinglong Mountain in Gansu
              DATE:17 November 2017 瀏覽次數:
              + . -

              This ropeway was completed in October 2009. It is of the double-cable reversible cabinlift type (with fixed grips), with the horizontal distance of 696.19 m, elevation difference of 94.66 m, one-way transport capacity of 360 people / hour and running speed of 5.23 m / sec.

              No bracket is provided for the line, cabinlift is about 200 m above the ground at most, and the independent horizontal rescue system is adopted.

              一本一本久久A久久精品综合